Construction &
Maintenance Projects

Optimum Shah Gas Expansion (OSGE)

  • Equipment Installation like LV Switchgears, Protection Panels, Distributions Boards, DC System (UPS, Batteries), Lighting Panel, Emergency Push Bottoms, LCS, Power Secondary JB’s etc.
  • New Extension from existing general facility to new facility
  • Demin Package Works
  • All MV & LV Cable Laying and Termination works
  • Lighting & Earthing
  • Cable routing
  • Cathodic protection
  • All Instrumentation works.
Image 1
Image 2
Image 1
Image 2

Crude Flexibility Project (Package 1, 2 & 4)

  • Equipment Installation like Oil type Transformers, HV GIS, Switchgears, Protection relay panels
  • DC system
  • HV cable laying
  • MV Cable laying
  • LV System, Fire Alarm System, PAGA system, Telecom System,
  • Cathodic Protection
Image 1
Image 2
Image 2
Image 2
Image 2
Image 2
Image 2
Image 2
Image 1
Image 2
Image 2
Image 2
Image 2
Image 2
Image 2
Image 2

Solar PV Project - Phase-2 (1.5 GW Solar Park)

  • Cable Trench Excavation, Preparation of beddings & Backfilling
  • Laying of HDPE Pipes for Road Crossing & RS Cable Protection
  • Cable Laying, Tagging & Dressing (MV up to 36KV, LV, Tracker Cable & FO)
  • Laying of Conduits
  • Cable Termination up to 36KV
  • Installation of Inverter & MV Power Stations
  • Earthing Works
  • Fire Proofing Works
Image 1
Image 2
Image 1
Image 2

Al Taweela Alumina Project

Dome DZ is one of the main contractors for Electrical & Instrument works for Al Taweelah aluminium refinery for Emirates Global Aluminium (EGA).

The project is carried out under project manager of Bechtel-Petrofac JV.

The scope includes:

  • Electrical & Instrumentation Works
  • HV Pre-Commissioning Testing, Commissioning Support
Image 1
Image 2
Image 2
Image 2
Image 2
Image 1
Image 2
Image 2
Image 2
Image 2

Misc. construction projects with OMV, Yemen

Inspection, Refurbishment, painting, and re-erection of 8 Existing Produced Water / Salt Water Storage Tank

Power Generation WP1

  • All Power and control works for MCC Building and power Generation including MV/LV Switchgear installation, Cable pulling and termination, instrumentation and control works
  • Mechanical works for Royse Rolls Generator.

Completion of Crude Oil Tank 3602 & 3603 at CPF

  • All civil and electrical works
Image 1
Image 2
Image 2
Image 1
Image 2
Image 2

UNDP - Rehabilitation of two Sheds (8000 m2 for each shed), Aden Port, Yemen.

Civil, Structure & Electrical Works:

  • Demolish the damaged part of the sheds.
  • Rebuild, Repair & replace the damaged structural items.
  • Paint the whole shed.
  • Supply and install new Roof Sheets.
  • Build new Electrical Rooms.
  • Supply & Install Power, earthing, Lighting & Socket Systems.

Al Hiswa Power Station, Yemen

Dome Trading & Contracting Co. Ltd. conducted civil, mechanical and structural works for installation of 2×30 MX GE TM2500 turbines for Public Electricity Corp. (PEC) with main contractor Calik Energy Company.

OMV Yemen project

Complete installation of Central Processing Facility (CPF) with capacity of 30,000 BPD, civil, mechanical, electrical & instrument works for OMV Yemen.

Image 1
Image 2
Image 2
Image 2
Image 2
Image 1
Image 2
Image 2
Image 2
Image 2

Carbon Black & Delayed Coker Project

Dome DZ provided the following to ADNOC Refining with Samsung Engineering.

  • 3 Substations including all equipment MV & LV switch-gear & cable laying over 2,100Km
  • E & I works on all process areas
  • Telecom Systems
  • Testing & Pre-commissioning including loop testing of 19,000 Nos.
  • HV Pre-commissioning and testing

HP Flare Modification

Civil, Mechanical, Electrical and Instrumentation works for ADNOC Onshore with Petrofac.

EPC for ASAB FFD Project

Subcontract for installation of PAGA system modification work at ASAB CDS.