Projects
Dome Projects

Environmental Impact Assessment Services for Dubai Islands Project

Nakheel Properties PJSC (Nakheel) is currently developing Dubai Islands (formerly known as Deira Islands) consisting of a series of five (5) inter-connected islands, namely, Islands A, B, C, D and E (the Project) located in Deira, Dubai.

An EIA study for the Project was already carried out and successfully completed by Dome in 2017. However, currently Nakheel revised Vision Master Plan, developed concept master plan for the individual islands and marine scope for the whole Project. Dome has been contracted to undertake the Environmental Impact Assessment Study for the stage 1 of the project in accordance with the requirements of Dubai Municipality.

Software / Training

Long term agreement for provision of Petroleum Exploration Software and training for ADNOC, ADOC and Mubadala Petroleum.

Image 1
Image 2
Image 2
Image 2
Image 2
Image 1
Image 2
Image 2
Image 2
Image 2

Carbon Black & Delayed Coker Project

Dome DZ provided the following to ADNOC Refining with Samsung Engineering.

  • 3 Substations including all equipment MV & LV switch-gear & cable laying over 2,100Km
  • E & I works on all process areas
  • Telecom Systems
  • Testing & Pre-commissioning including loop testing of 19,000 Nos.
  • HV Pre-commissioning and testing

HP Flare Modification

Civil, Mechanical, Electrical and Instrumentation works for ADNOC Onshore with Petrofac.

Fire Fighting System

Design, manufacturing, testing, commissioning and training for fire fighting vehicle / system with water (1,000 L), foam (3,000 L) & DCP (500 kg) tender and a 28m platform for ADNOC refining.

Environmental Impact Assessment (EIA) Study for ADNOC Project Wave Project

ADNOC Onshore is implementing Project Wave (the Project), which aims to utilize treated seawater as an alternative for the injection requirements on all ADNOC Onshore fields (BAB, Bu Hasa, NEB and Southeast). This Project Wave represents ADNOC ++ initiatives for ensuring an additional and more sustainable source of water for injection in ADNOC Onshore fields.

The proposed Project Wave will include Component-1: construction of a Seawater Treatment Plant (SWTP) at two locations (Mirfa and Nouf) and Component-2: build a network of pipelines to transport treated, filtered, low- Sulphate seawater to all Onshore Fields (nine separate battery limits).

Dome has been commissioned to undertake the Environmental Impact Assessment (EIA) study for the Project in accordance with the requirements of Environment Agency - Abu Dhabi (EAD) and ADNOC.

Dubai Electricity & Water Authority

Supply, Installation & Commissioning of Pilot Burners & Flame Detection System for Ground Flare at Jebel Ali Power Plant.

Safety Studies for LPIC-EPC4 NGL Pipeline and OGC 32” Gas Loopline-OGC/ORPIC, Oman

  • Quantitative Risk Assessment Study
  • Fire Gas Dispersion and Explosion Risk Analysis
  • COMAH
  • Emergency Response Plan

EPC for ASAB FFD Project

Subcontract for installation of PAGA system modification work at ASAB CDS.

JENBACHER INNIO - Distributor New Units & Services

“Dome is proud to be INNIO’s distributor in Yemen. We believe that the distributed power concept can help solve the challenge of providing power to Yemen’s dispersed population with low grid power availability. Gas power can provide a stable electricity supply that is healthier and greener—all at a lower cost.”

www.innio.com/en/jenbacher

Image 1
Image 2
Image 2
Image 2
Image 2
Image 1
Image 2
Image 2
Image 2
Image 2

Major Soft Drink Producer

Capacity: 3700 kWp

Location: Dubai Investments Park

Type of installation: Roof top

Estimated Generation (25 Years): 139,451 MWh

Commissioned: Q3, 2019

HSE Studies for Siba Field Development Project, Iraq

A consortium led by Kuwait Energy Iraq Limited (KEIL) has been awarded by the Iraq Ministry of Oil with the Exploration, Development and Production Services Contract (EDPSC) of the Siba contract area in Basra area in the south of Iraq. KEIL is also the operator of Iraq’s Block 9 and is a major partner in the development of Mansuriya gas field.

The Siba Contract Area is a gas filed situated in the southern end of Iraq, within the Governorate of Basra. It will be developed to reach a contractual dry gas production rate of 100 MMSCFD, 1,200 bpd of LPG and 19,000 bpd of condensate. The Contract Area lies directly adjacent to the Iraq-Iran border along the Shatt Al Arab River.

Dome International LLC (Dome) has been commissioned by KEIL to undertake the Environmental Impact Assessment (EIA) study and safety studies for the Production Facilities as part of the Siba Field development Project.