Projects
Dome Projects

Dalma Gas Development Project for ADNOC

ADNOC has initiated development of new gas reserves, namely Dalma Gas Development (DGD) Project in Northwest offshore region of Abu Dhabi. DGD Project is an integral part of the overall efforts to develop these untapped hydrocarbon reserves, with priority given to produce 340 MMscfd of raw gas from Satah, Hair Dalma and Bu Haseer fields by 2024. The overall DGD project development shall comprise of offshore facilities (Package-A) and onshore facilities on Arzanah Island (Package-B) to export gas to Habshan and export condensate to Zirku Island.

As part of DGD project, Dome has been contracted by Tecnicas Reunidas (Main Contractor) to undertake all the HSEIA Dossier and other HSE studies and procedures of the EPC package of the DGD project.

Optimum Shah Gas Expansion (OSGE)

  • Equipment Installation like LV Switchgears, Protection Panels, Distributions Boards, DC System (UPS, Batteries), Lighting Panel, Emergency Push Bottoms, LCS, Power Secondary JB’s etc.
  • New Extension from existing general facility to new facility
  • Demin Package Works
  • All MV & LV Cable Laying and Termination works
  • Lighting & Earthing
  • Cable routing
  • Cathodic protection
  • All Instrumentation works.

Fugitive Gas Emission Monitoring

On-going long-term agreement with ADNOC Group for the Oil and Gas Methane Partnership (OGMP-2) that includes monitoring of fugitive emissions, vent emissions, and combustion efficiency ensuring compliance with industry regulations.

Hail & Ghasha Development (HGD) Project and CO2 Recovery for ADNOC

The Hail & Ghasha (HGD) Project is being implemented by ADNOC in order to develop the untapped oil and gas reserves from the highly sour Hail and Ghasha fields targeting to start production by the end of 2027. Production of Hail & Ghasha Field is ~1000 MMSCFD of raw gas and 82.5 MBPD of Oil. The project will include new artificial island Drill Centre (DC) production facilities located at Ghasha field which will route well fluids via subsea pipelines to new Ghasha Offshore Processing (GOP) facility. Final processing of all reservoir fluids is at the new Onshore Processing Plant (OPP), located 10km east of Ruwais Industrial City on a coastal location. Production from Hail Field is routed directly to OPP via subsea pipeline.

Dome Oilfield Engineering & Services LLC (Dome) has been commissioned by ADNOC to undertake the Environmental Impact Assessment (EIA) study for the Project in accordance with the requirements of ADNOC and Environment Agency - Abu Dhabi (EAD).

Image 1
Image 2
Image 2
Image 2
Image 2
Image 2
Image 2
Image 2
Image 1
Image 2
Image 2
Image 2
Image 2
Image 2
Image 2
Image 2

Solar PV Project - Phase-2 (1.5 GW Solar Park)

  • Cable Trench Excavation, Preparation of beddings & Backfilling
  • Laying of HDPE Pipes for Road Crossing & RS Cable Protection
  • Cable Laying, Tagging & Dressing (MV up to 36KV, LV, Tracker Cable & FO)
  • Laying of Conduits
  • Cable Termination up to 36KV
  • Installation of Inverter & MV Power Stations
  • Earthing Works
  • Fire Proofing Works
Image 1
Image 2
Image 1
Image 2

Crude Flexibility Project (Package 1, 2 & 4)

  • Equipment Installation like Oil type Transformers, HV GIS, Switchgears, Protection relay panels
  • DC system
  • HV cable laying
  • MV Cable laying
  • LV System, Fire Alarm System, PAGA system, Telecom System,
  • Cathodic Protection

Supply of Oil spill Prevention Equipment

We offer supply and training for wide range of Oil spill prevention and environmental protection equipment including but not limited to Oil spill booms, oil storage tanks, oil skimmer units, blowers, and Power packs.

Long Term Technical Services Contracts for Maintenance of Centrifugal Gas Compressors

Inspection, Maintenance and Repairs of MAN TURBO , MITSUBISHI, G.E, DRESSER RAND,ELLIOT, SIEMENS DEMAG, DELAVAL STORK, KAWASAKI, YORK and HITACHI Centrifugal Gas Compressors and Auxiliaries for ADNOC ONSHORE and ADNOC OFFSHORE.

Isopropyl Alcohol (IPA) Project in TAZIZ Derivative Park

ADNOC is considering the creation of a new Chemicals Derivatives park, with investments in Derivatives projects through TAZIZ Industrial Park, the recently established joint venture between ADNOC and ADQ.

As part of project implementation, ADNOC initiated the FEED project for the Isopropyl Alcohol Plant that will be designed to produce 130 KTA of Isopropyl Alcohol using existing feedstock (Propylene from ADNOC Refining). The estimated quantities of Propylene feedstock for the IPA Unit is 100 KTA used through direct hydration to produce Cosmetic Grade IPA for export. Dome has been contracted to produce the HSE studies for the IPA project as per ADNOC standards and requirements.

Image 1
Image 2
Image 1
Image 2

Al Taweela Alumina Project

Dome DZ is one of the main contractors for Electrical & Instrument works for Al Taweelah aluminium refinery for Emirates Global Aluminium (EGA).

The project is carried out under project manager of Bechtel-Petrofac JV.

The scope includes:

  • Electrical & Instrumentation Works
  • HV Pre-Commissioning Testing, Commissioning Support
Image 1
Image 2
Image 2
Image 2
Image 2
Image 1
Image 2
Image 2
Image 2
Image 2

Misc. construction projects with OMV, Yemen

Inspection, Refurbishment, painting, and re-erection of 8 Existing Produced Water / Salt Water Storage Tank

Power Generation WP1

  • All Power and control works for MCC Building and power Generation including MV/LV Switchgear installation, Cable pulling and termination, instrumentation and control works
  • Mechanical works for Royse Rolls Generator.

Completion of Crude Oil Tank 3602 & 3603 at CPF

  • All civil and electrical works

Project Growth Study

Verify ADNOC’s growth plans, recommend amendment, or identify new and alternative production opportunities to maximum recoverable petroleum resources.